WP5: Operational runs of the integrated system

Objectives

  • Set the new wave system to an operational/productive mode running for a period of 10 years at a resolution of 1/60 degrees .
  • Develop a data base containing detailed  results on the wave energy for the EEZ of Cyprus.

Work Description

  • Operational/productive run of the model.
  • Archiving  the wave energy results in date base

Deliverables

  • D14 A wave energy data base  for the EEZ of Cyprus
  • D15 A technical report in which different ways of exploiting the results of the data base will be clarified